Current stage of implementation
- Idea of the project
- Design and estimate documentation has been prepared
- The concept of the project has been developed
«This investment project implies the development of a raw phosphate base in the Amur region with the simultaneous construction of processing them into the final product — phosphoric acid, which is the basis for the production of feed phosphates and fertilizers.
The average content of P2O5 in the ore is 4.15%. The ores are environmentally friendly. Easy-to-enrich: Apatite recovery rate for various enrichment schemes from 75% to 93%. The field is planned to be developed in an open-pit way. Ore deposits of medium strength, which allows you to work out of without the use of drilling and blasting.»
«Apatite concentrate — 220,000 tons / year;
Feed thermophosphates — 115 000 tons / year;
Fertilizing thermophosphates — 105 000 tons / year.»