Current stage of implementation
- The business plan and financial model of the project have been prepared
- A permit for project implementation has been obtained (construction, operation, etc.)
- Engineering documentation on the project has been developed
The project implies the construction of an energy-saving technological line for the dry method of cement production with a capacity of 3.5 million tons per year for the period 2020-2024. The construction of the plant is planned at three main sites — a cement plant site, a raw material quarry site and a railway station site.
The company’s products will be Portland cement of the CEMI-CEMV types, strength classes 32.5; 42.5; 52.5 in accordance with GOST 31108-2016. The technology and serial production of domestically developed nanocements will also be mastered.