Project description
Increasing the mooring front (the length of the mooring line is at least 210 m, the navigation depth at the berth is 10.2 m), creating an approach channel and reconstructing the operational water area of the berths in the area of shop No. 14 (navigation depth is 10.2 m to ensure the reception and processing of calculated types of container ships).
Description of project services and / or products
Comprehensive logistics service. Specializes in handling import and export container flows from major ports in Korea, Japan, and China.